Tuesday, September 1, 2026

Letter from Conservation Association to TNRD regarding zoning amendment Lot DL 5739

Please accept the following letter for the September 3, 2026 meeting regarding the application for zoning amendment Lot DL 5739, Lac Le Jeune, BC. The Lac Le Jeune Conservation Association has concerns related to the rezoning application, that changes original designation of land use to that of a Hobby Farm. 

Concerns: 
Our concerns are not with the development of a hobby farm per se, but rather with the effect(s) that the revised land usage may have on the water quality of the “little lake”. 

Under the original designation i.e. single family LR1, P1 any housing development would be strictly regulated with respect to services to and from the development, most specifically, relative to our concerns, are those related to waste and sewage disposal. In a housing development, sewage disposal would be via engineered, inspected and certified septic systems. Under the rezoning, safe removal of animal waste might not be as easily achieved or monitored. Animal waste would not be processed through an approved septic system. 

The proposed usage would presumably have some number and variety of animals housed on the property defined under the rezoning application. This designated parcel lies over the lake aquifer, is contiguous with the riparian area, the boundaries are immediately adjacent to the lake shore and the designated area encompasses a significant proportion of the natural drainage area above the lake. This is complicated by the inclusion within the boundaries of the property of an intermittent creek that also accumulates drainage from areas above as well as outside of the property and flows most actively during the spring thaw orfollowing any heavy rain across the property and directly into the little lake brining with it any contamination it carries. 

Our concern is that without a thorough preliminary study aimed at establishing appropriate regulations and mitigation methods specific to the approved land usage, there would be a significant risk of high levels of coliform bacteria and other biologically hazardous materials entering the lake water. It should be noted that the Lac Le Jeune community and the park residents already intermittently receive boil water advisories associated with elevated coliform levels, so it would be most unfortunate if this risk were to be increased through failure to establish appropriate regulations and controls. 

The Lac Le Jeune community has been actively involved in monitoring of the lake waters since 2012 when the Ministry of the Environment proposed that we set up a volunteer group to collect water samples and record data related to the water quality with instrumentation supplied by the Ministry. 

The volunteers were taught the methodology and initially directed by the Ministries’ head technologist. The study continued for the next 5 years, accumulating data on oxygen concentration, ionic composition, chlorophyl a concentration, as well as total and organic carbon concentration. Data was taken every three weeks over the period of the study by a volunteer body that consisted of at least 15 dedicated Lac Le Jeune residents. 

This study was followed by an even more thorough one under the auspices of BCIT, that included aging of fish, analysis of fish diseases and parasites, estimation of fish population, analysis of phytoplankton and zooplankton species and populations and also included analysis of benthic species and populations. Our volunteers assisted with this study as well. The results of both studies may be viewed on public record. 

I think this testifies to the dedication of our community to the welfare of our water supply and to the degree of education those of us who participated have received in water monitoring technology. 

It is our hope that airing these concerns will help in the development of a set of protocols that will ensure a safely run and successful hobby farm. We are sure that Dr. Wynne with his medical training is sure to be aware of all of the issues inherent in such a venture. 

Sincerely, 
Lac Le Jeune Conservation Association

Thursday, August 21, 2025

What is the white foam along the lake shore?

Rosser1954, CC BY-SA 3.0, via Wikimedia Commons

Residents are curious about the white foam that appears along the shoreline, so we asked our local Lac Le Jeune Conservation Association water monitoring expert to explain! Also, the fly fishers out there might want take note of where the trout seek optimum oxygen levels -- explained below. 

From Hugh Burton

----------------------------

This is not an unusual phenomenon particularly at this time of the year.


Our lake is at its highest point in the production of living organisms, most of which are going through their respective life cycles, which include the production of metabolic byproducts like proteins and carbohydrates. Part of these cycles includes death of these organisms, which as they decay adds to the soup of suspended molecules.
When we get a good brisk wind, particularly one that causes the wave crests to break, we get a foaming action. Think of beating egg whites.

At this time of year there is another phenomenon that increases the chance of foaming by restricting the water volume in which the high level of biological activity is occuring. This is the thermocline.

Mike Brugger and I did a lake monitoring run this morning and found that there was a very strong 4m thick thermocline starting at 8m below the surface. This is virtually like putting a 4M thick horizontal tarp down at 8m, thus dividing the lake horizontally in two distinct sections.

Above the thermocline the oxygen level was 34% and the water temperature was 17C. Below the thermocline the oxygen level was 9% and the temperature was 8.1C.

Added to this, is the depth to which the light is effectively penetrating, which on this date at this location was 5M.

So, most of the intense oxygen dependant and light dependant biological activity at the moment is restricted to the top 5 to 8m of water.

In other words ideal conditions for a good frothing given the right wind. It is non toxic unless there is growth of certain toxic algae or bacteria, which fortunately our lake does not cultivate.

* Note 1: the thermocline is defined by a drop of one degree Celsius over 1 meter. In this case there is a drop of 8 degrees Celsius in 4 meters. 

* Note 2: our trout need at least 30% oxygen to survive. So, they are restricted to the top 8m.

Friday, May 6, 2022

Lake Monitoring: All the Cool Kids Are Doing It! Training Date Set!


We are delighted to report that the LLJ Lake Monitoring program is back in action!  The probe is working and we were able to get measurements on the big lake in January and February, but we need your help.  We are still looking for volunteers to assist with this important program to ensure our lake stays healthy. 

With a few more volunteers,it will only be a teeny, tiny commitment to participate! We have a training date set (Thursday, May 12, 2022 @ 7:00 pm - 3840 Rainbow Drive on the lakeside lower deck) and will provide all the resources you need. All you need to do is volunteer a few hours of your time!  

Come on out, join us and learn more (and we promise there will be treats). As an added bonus, you have an excuse to get out on the lake (either summer or winter)! 

Please contact Colleen Kennedy (colleenkennedy.apple@icloud.com or 778-921-0095) if you are interested in learning more!  Can’t make the orientation on the 12th? No worries, we can also provide 1:1 training at a later date. If you are signing up, please advise if you have access to an ice auger for the winter monitoring. For those who have already signed up – we’ve got you! 



Saturday, April 30, 2022

Want to Play in the Lake?

                                                                                                               Image: Ron Lyster, 2021

Are you looking for an excuse to get out on the lake? If so, we hope you will join us and volunteer for the Lac Le Jeune Lake Monitoring Program. This initiative helps measure the health of our two lakes by lowering a probe into the lake to capture information like temperature and dissolved oxygen!

The old adage rings true - many hands make light work! So, with just a few more community volunteers, the time commitment of each person will be less than 2-3 hours per year!  The good news is that the fabulous Hugh Burton is planning a brief orientation session in the coming weeks (date and times to be finalized) and he will teach you everything you hoped to learn and more! 

If you are interested in joining us, please e-mail colleenkennedy.apple@icloud.com with your phone number and preferred e-mail address and we will notify you when the orientation is happening!



Saturday, September 19, 2020

Lake Monitoring Program: Call for Volunteers!

The Lac Le Jeune Lake Monitoring Program has been quietly humming along thanks coordinator Hugh Burton and the many volunteers over the years. Going forward Hugh will still be involved but residents Colleen and Ron Lister have stepped up to take care of the scheduling and servicing equipment. 

Several individuals have indicated interest in assisting with lake monitoring. However, we could use more volunteers. Ideally we will be have enough pairs to do one profile per month from ice off to ice on -- so approximately 7 months. 

This is fun work and you will learn from the experts. You will be trained in the procedures and who knows, there might even be a t-shirt ;) 


Hope to hear from you! (Leave a comment).

Friday, July 13, 2018

Our Lake - Status Report

The following is a status report from Hugh Burton



Andrew Mac Math and I have done the first two lake profiles for May and June. (see attachments) It is my intention to continue doing a profile at least once per month till ice on or it gets too darn cold to continue.
 It is not an onerous or difficult task, so if anyone wants to volunteer an hour or so I would really appreciate it. Give me a call: 250-314-6760 or send an email to this address. It takes two people to do it safely, so if you have someone who you could partner up with I would be happy to provide a demo on the procedure. 
The best results are obtained by ensuring that the profiles are taken within a few days either side of ones done in previous years. This means that the next one is due between the 16th and 20th of July. 
Comments: Refer to the data sheets below for values.
On the whole our lake is doing not too badly for a lake that is in the middle of its life and whose watershed has undergone significant changes over the past 30 to 40 years – expansion of residential and park areas, increase in paved roads with commensurate increase in vehicular traffic and most recently the pine beetle infestation. 
Whether you have been boating or fishing or just using the lake water for the household, you will have noticed that, over the past two years the lake water has become quite brown in colour and the sediment concentration has increased considerably. I know that I have had to change my filters almost twice as often over this time frame.
Both of these conditions reduce the transparency of the water Note the difference in the secchi depth between June 17/17 and June 18/18  - 5.7m vs  3.9m. (Secchi depth is a measure of the transparency of the water).
There are a number of factors that have come together to produce these conditions. 
First: A significant percentage of the watershed is still recovering from the pine beetle infestation. Debris from the logging is now decaying providing an increase in organic material and.
Second: The vegetation replacing the pine forest is predominantly deciduous poplar,aspen, alder and willow, all of which produce leaf litter that as it decays adds to the organic loading in the form of tannins (hence the brown colour).  
Third: The pine tree removal has led to an increase in exposed ground leading to greater than normal erosion, which has been magnified by two years of heavier than normal snow load followed by relatively high runoff. 
Forth: The beaver activity at the outlet is maintaining a high water level throughout the year which causes a reduction in the flow through and resultant slow clearing of the lake. Variation in lake, water level is essential to a healthy aquatic environment. 
Higher than normal water levels cause incorporation of shore areas that at normal levels would be dry. This may also lead to an increase in conductive salts and sediment through erosive wave action and leaching. Note the elevated numbers under specific conductance columns.
Long term high water levels also increase the organic material loading by eventually killing vegetation in the affected areas. This decays over time, which may, if severe enough, lead to an undesirably high organic content and reduced O2 levels during the winter resulting in possible fish kill. (this is not a problem at this point in our lake). 
Ideally, the water levels should vary throughout the year. Temporary high water levels will increase the nutrients essential to the support of the food chain and therefore to a healthier lake. Changes in water level are also necessary for the health of the wet lands that are so important in purifying water and providing bio-habitat.
Obviously there is a delicate balance that must be maintained among these factors if optimal conditions are to prevail.
The changes we are seeing will definitely affect our aquatic environment in the short term but they are probably not so much detrimental as they are annoying. However, they do demonstrate the need for careful monitoring and maintenance of our watershed.

Data Sheets (click image for a larger view)








Monday, March 19, 2018

Please pick up!


Have you heard about stools to fuels -- street lamps that run on doggie poo? Unfortunately, we don't have them here! And now that the snow is beginning to melt we're noticing the problem of not picking up after dogs is worse than ever. 

Please prevent this accumulation from ever happening by promptly dealing with dog waste. It's especially important to pick up after your dog near the lake. Your neighbours will also appreciate your efforts on or around their property. Bonus: If you're walking on Lac Le Jeune Road we even have free bags and drop off service.


Monday, August 28, 2017

Report: BC Lake Stewardship and Monitoring Program

Lac Le Jeune’s monitoring program began in 2012 and was conducted by the Lac Le Jeune Conservation Association volunteers in partnership with the Ministry of Environment. Here is the report from the program (8 pages, PDF).

Saturday, June 24, 2017

Lake Data for June 2017

From Hugh Burton:

I did the lake profile on June 17. Everything looks good. Lots of O2 almost to the bottom and the water is clear (if a bit on the brown side). The specific conductance is normal for the time of year.

click image for larger view

Sunday, May 14, 2017

Further comments or follow-up questions for AJAX?

The following document from KGHM is a response to the questions and concerns that the Lac Le Jeune Conservation Association submitted during the recent Ajax Project Public Comment Period. 

Do you have any comments or follow up questions to the response we received? Please add your comments below or contact a Lac Le Jeune Conservation Association area rep. The Association will compile your input and send a letter of concerns. 

(Click to access full document (PDF)


 Click to access full document (PDF)
Click to access full document (PDF)

Monday, March 6, 2017

Information for Waterfront Land Owners

Neighbours,

Please be advised of the following information related to waterfront property around Lac Le Jeune (all documents can be reviewed on-line):

From the Quick Guide brochure

1. Quick Guide For Waterfront Land Owners and Developers - Province (PDF)

2. Riparian Areas Regulation Guidebook For Waterfront Home Owners and Property Developers - Province (PDF)

3. Riparian Areas Regulation FAQ Sheet - Thompson Nicola Regional District (PDF)

4. Lakeshore Development Guidelines -Thompson Nicola Regional District (PDF)

5. On The Living Edge, Your Handbook For Waterfront Living - Sarah Kipp and Clive Callaway (Excerpts from this book are available online)

Regulations are in place that restrict removal of natural landscape beside the lake. The basic intent is to retain the integrity of natural conditions that protect fish and wildlife habitat, as well as maintain water quality. Clear cutting of lakeshore property within the riparian area (30 meter setback from lake), especially steep slopes, and removal of shoreline vegetation are not permitted.

~ Gregg Lindros ~

Monday, April 11, 2016

LLJCA Public Comment: KGHM Ajax Application


 April 11, 2016

Lac Le Jeune Conservation Association
PO Box 5044
Lac Le Jeune, BC
V1S 1Y8

To the Environmental Assessment Office:

During the public comment period, the Lac Le Jeune Conservation Association (LLJCA) organized a distributed review of the studies in the KGHM Ajax Application/EIS that are relevant to conservation and quality of life in our community. In addition, members of LLJCA participated in public information meetings, and read available expert reviews of the Ajax Application, namely those contracted by Kamloops City Council, Kamloops Physicians for a Healthy Environment, Kamloops Moms for Clean Air, Kamloops Area Preservation Association, and Sierra Club BC. We share the concerns raised in these expert reviews, and are extremely grateful for these contributions to the dialogue about a proposed mine situated in close proximity to residences, and in an area abundant with excellent natural resources and recreation.

The members involved in the LLJCA review generated a list of key concerns and questions related to our area. They do not include the equally serious concerns shared with Kamloops residents, such as those relating to health hazards, disadvantageous changes in atmospheric conditions, excessive removal of water from the Thompson River/Kamloops Lake reservoir, in a time of diminishing water reserves through loss of glaciation and the adverse impact on the biota in the working area.

Lac Le Jeune is approximately 9 kilometres south of Goose Lake Road, which essentially marks the beginning of altered landscape to accommodate the proposed Ajax Mine. As well, with our road systems in question, increased traffic related to mine activity could be right at our doorstep. As a community, the location of Ajax Mine concerns us a great deal.     

Overall, the conclusions we have drawn from this process is that the the Ajax Mining studies consistently underestimate the mine’s effects on our environment during all phases of the project. Furthermore, there are flaws in the research methods used in these studies.

Given that many of the issues span several studies and reports, we have not attempted to categorize our list to align with the sections outlined in the Ajax Mine Application. Instead, we are using a simple framework comprising 4 categories. For efficiency, we have listed our comments in point form. 

  1. Pollution and Environmental Disasters
  2. Fish and Wildlife
  3. Health and Safety
  4. Recreation
1. Pollution and Environmental Disasters
  • Everything in the environmental report is based on the best possible outcome from steps Ajax proposes to take to reduce problems. They should be reporting what the worst possible results from mine operation might be.
  • There has been an increase in litter on Lac Le Jeune Road, much of it a result of commuter traffic from Kamloops to the Highland Valley Copper mine (as reported by RCMP at our Association’s Annual General Meeting). A further increase in traffic will no doubt result in more litter. How will this issue be addressed?
  • We enjoy spectacular night skies in our area. We are not convinced from the studies that light pollution will not an issue.
  • We have concerns with respect to various faults described in the application. The use of the term “faults” were thought to indicate the potential for instability in the area to be used for tailings ponding. In the section on Geology, faults refer to interfaces between non or low ore bearing rock basins and zones that are suitable for ore extraction. These faults are ancient and stable (non -active) interfaces, and clearly they would not constitute a threat with respect to earthquakes.
  • We request clarification of what is meant by the term “fault”, particularly in relation to where it is used in reference to the Goose Lake and Edith Lake zones.
  • There is a high level of concern over the use of Goose Lake as a tailing pond retained by dams that have so recently, here in B.C. as well as other places in the world ruptured with catastrophic results. The failure of a tailings pond dam at Goose Lake would have serious consequences to the environment and potentially fatal consequences for human and animal life in the downstream rangeland. Given the history of tailing pond disasters, we question any guarantees against such failures.
  • “Winter conditions” were not evaluated. There would be a build of air borne particulates on the ice, snow/ice cover, which would lead to a pulse of contamination entering the water upon ice off. This would be unlikely to change the composition of the contaminants but would result in a spike in concentration, which could potentially increase the biological impact significantly.
  • Lac Le Jeune is a direct source of drinking water for residents who are not using wells. During the winter months we take measures to ensure that the surface of the frozen lake remain free from contaminants, such as salt from road maintenance, and pet dog feces. What will be the accumulation of particles on the lake surface during the winter months? How will that impact the quality of our drinking water?
  • Biological mitigation is not going to have a positive effect in the area immediately surrounding the pit activity.
  • Low water flow/levels have the effect of increasing the concentration of contaminants as well as heightening their impact as a result of the simultaneous increase in water temperatures due to reduced volume.
  • O2 levels drop with rising water temperatures and within a certain range of temperature rise, certain biochemical reactions - e.g. production of organic mercury through anaerobic bacterial action – will increase as the O2 levels drop. Metals in organic form have a much increased impact on the health of biota because they are more readily incorporated into the body.
  • Low flow/ levels provide ideal conditions for the growth of the blue green algae, many of which produce undesirable or toxic metabolites in water supplies. When blooms of these types of algae die off they add to the organic loading in the aquatic systems and commensurate degrading of the O2 levels during ice on conditions.
  • Regarding leachate of toxic waste from rock and ore extraction, we have read over the parts of the application that deals with Jacko Lake, and note that there have been studies on the likelihood of leaching of toxic materials such as lead and arsenic from the rock extracted from the pit zone and stored as waste rock. The rock itself and the surrounding area on which it would be stored tests as basic in pH, which means that there is a low potential for leaching of acid soluble material. This means that though the rock and minerals within the rock may contain amounts of these materials they are not likely to leach into ground water or aquifers. These findings at least coincide with our knowledge of the alkaline nature of the waters and soils of the area (Jacko Lake has an alkaline pH as do the soils of the surrounding area). However, this does not mean that there are not other chemical or physical mechanisms which may contribute to elevated levels of toxic materials in Jacko Lake and Peterson Creek and associated aquifers, but they would probably be slow developing, long term contributors.
  • The studies were reportedly based on laboratory tests on rock and ore samples and at least in part on rock residues that had been exposed during previous open pit operations immediately east of the proposed site.
  • Strategically placed dams and enclosure constructs in the lake itself are the mitigation methods for preventing out washed materials entering the Jacko lake water system. These would not prevent the continuous deposition of fine airborne materials entering the lake and adjacent stream waters. Since fish and their spawn, as well as aquatic reared invertebrates, plankton and phytoplankton are affected by fine sediments through chemical and physical as well as through oxygen and light attenuation, continual deposition of such sediments would continue to be a problem, if not immediately then likely in the long term.
  • Given the size of these particles they would be subject to biological and physical conditions in the aquatic environment that might increase the release of materials such as arsenic and lead converting them to more bio-toxic organic forms. We are unable to find any suggestions for effective mitigation of this type of hazard. It would be very difficult to manage given the mechanisms that will be productive of fine air borne particulates – loading and transport of rock and fines, as well as blasting etc.
  • Peterson Creek is an open water course through a residential part of the city as well as in a park. How will the mine impact Peterson Creek?
  • How will drawing large quantities of water impact the level of the Thompson River? If it drops much lower this is going to affect the Adams River run of salmon.
  • Where will the tailings pond drain? A spill will surely flow out Peterson Creek and into the river.
  • The studies do not deal with the effects of blasting on groundwater in Aberdeen.
  • It was quite concerning that KGHM used mitigated soil as the starting base for the study. A base line should always be of unaltered material.
  • As air quality is a significant concern, we request the studies are resubmitted using a proper base line. Any subsequent studies that used the initial results should also be resubmitted using the correct data.
  • Was data from both the Aberdeen and Federal Building Air Quality station used? If so, was the data averaged between the two stations?
  • Did the air quality station in Aberdeen registered the occurrence of cloud clover at that elevation?
  • Did the model include the regular occurrence of cloud bank at the proposed mine elevation?
  • Was North-east winds registered and accounted for at the Aberdeen station?
  • Were the following gases registered and included in the study?
Ground-level Ozone (O3)
Nitrogen Dioxide (NO2)
Sulphur Dioxide (SO2)
2. Fish and Wildlife
  • Low water flow from April-September in Peterson Creek and Jacko will not meet the needs of fish. There seems to be little in the way of mitigation on this item.
  • Is there a plan if we reach drought conditions?
  • Noise and vibration from blasting will result in displacement of wildlife.
  • The Mine activity will likely result in animals that frequent this area in the winter moving toward the city boundary, further increasing the nuisance factor for residents.
  • American Badger is a red listed species and relies on the wetlands for it habitat (which is going to be destroyed before/during the construction phase, so impact will be bad).
  • The area around the Ajax site is a major overwintering habitat for both white tail and mule deer. Neither of these species is on the endangered species list but it will certainly affect them through displacement.
  • Coyotes fill an extremely important niche in the the area by helping to keep rodent populations in check.
  • We are very concerned about the effect this project is going to have on the amphibians and the western toad population in the area.
  • There is a large population of the western toads at the mine site. The proposed mitigation is insufficient.
  • There are two Species at Risk blue-listed species of special concern. Even after mitigation measures there will complete habitat and breeding habitat loss, direct mortality and chemical hazards. This is unavoidable and will be permanent and/or have long term effects. This contravenes the BC Wildlife Act and the Species at Risk Act (SARA).
  • There is a large Western Toad population not identified in the application. They migrate in large numbers across the Lac Le Jeune Road in the area around Michell Ranch and Inks Lake underpass (approximate coordinates 50.613090 - 120.445136 to 50.618128 - 120.442969)
  • Jacko Lake is a breeding site for the Western Toad and has a large population. http://ca.geoview.info/little_toads_at_jacko_lake_bc,59944143p
  • The application shows that during the construction phase there will be a high mortality rate from clearing/grubbing and public road realignments, maintenance and supplies. There will be high habitat loss, so significant in the Infrastructure footprints that “all habitat occurring within the project IF is assumed to be permanently lost”.
  • Claims that a species will not be displaced refer to a habitat that will have already been permanently been removed by Ajax. This type of claim is a sleight of hands. 
  • Many chemicals will exceed aquatic guidelines throughout various stages of the project (arsenic, cadmium, chloride, mercury, selenium, sulphate, uranium, ammonia, nitrate, cobalt, copper, molybdenum, antimony). They have shown to have detrimental effects on amphibians.
  • “After the implementation of mitigation measures residual effects on amphibians are anticipated to result from habitat loss, direct mortality and chemical hazards. The loss of suitable amphibian breeding habitat will not be avoidable and will have an effect on amphibian species present in the LSA.”
  • “These effects will be present for the life of the project”
  • Clearly, there are going to be significant, negative, long term if not permanent effects for these protected species. This is unacceptable.
  • How many western toads will be destroyed by the creation of the entire mine site?
  • How will you manage the migration of any remaining western toads on a 24/7 basis?
  • How many western toads will survive after the 1st year of the mine site having been cleared?
  • There are eight SARA red/blue listed bird species that are threatened/special concern. Project effects include permanent habitat and breeding habitat loss, direct mortality to birds and damages to active and non active nesting sites. The BC Wildlife Act and Migratory Birds Convention Act, protects migratory birds from being killed, injured or captured, nests from being disturbed, damaged, destroyed or removed.
  • The merganser and yellow headed blackbird are both migratory.
  • Jacko lake and immediate surrounding environment act as resting areas or staging areas during migration. The mine will disrupt that activity, resulting in a reduction of habitat.
  • All of the birds will certainly be exposed to increased toxicity if base values of lead, copper, antimony, and mercury are raised as a result of the mine activity as they are at the upper level of the food chain.
  • These metals would be incorporated into the plankton and phytoplankton, aquatic invertebrates such as shrimp, blood worms, mayfly nymphs, etc. that feed on the plankton and phytoplankton will further concentrate the metals so that all organisms feeding on these or their adult forms will, over time continue to concentrate them. It is the DDT problem repeated. A more recent example of metal poisoning is that derived from exposure to lead shot in wild fowl. It is the concentration up the food chain that is the danger. Problems would include: neurological issues, intestinal blockage, genetic problems for embryos etc.
  • The most seriously affected would be those animals that feed on fish, such as  eagles, ospreys, loons, and mergansers.
  • There are a number of species that use this area as a breeding ground and some of them, would at least here, be considered rare and threatened. Clark’s nutcracker, Pileated Woodpecker, Lewis’s Woodpecker, Dusky and Sharp tailed grouse to name a few.
  • There are red and blue listed birds under Raptors that will be impacted.
3. Health and Safety
  • The increase in Lac Le Jeune Road traffic is a concern. Many Lac Le Jeune residents commute to Kamloops and use that route because there are infrequent vehicle accidents and generally winter road conditions are superior to Highway 5.
  • Closure of Goose Lake Road would reduce exit options during an evacuation.
  • An anticipated concern is the closure of “Lac le Jeune highway” which passes through the proposed Ajax site. We seek guarantees that Lac Le Jeune road will remain open as a means of access to Le Jeune. If both Goose Lake Road and Lac Le Jeune Road are closed, this leaves only one access to Kamloops and represents potentially a problem with egress in the event of fire in our area. Clarification of what is to be done with respect to this is essential.  
4. Lifestyle and Recreation
  • Residents of Lac Le Jeune chose this region because of the peaceful, quiet environment and the many opportunities to enjoy the outdoors. Lac Le Jeune Road and Goose Lake Road are popular cycling routes. Many residents enjoy fishing at Jacko Lake, especially early in the season when Lac Le Jeune is frozen. We frequently share photos and stories about our many wildlife encounters. The location of our community is ideal -- a scenic drive to Kamloops just 30 minutes away, yet we enjoy all the benefits of remote living.
  • We have concerns for the continued viability of the Jacko Lake fishery. Apart from the potential for the loss of this fishery due to chemical, particulate, and sonic causes, we wonder if KGHM Ajax would even permit access to the lake given its proximity to the active mining site. And, even if access were permitted, would intermittent closures during periods of blasting effectively eliminate the lake as the prime, world class fishery it in now?

In summary, we are not assured that Ajax Mining has undergone adequate research or considered all potential environmental impacts to claim that the project is “environmentally responsible”. For example, the environmental report is based on the best possible outcome from proposed steps to reduce dust. Ajax should be reporting what the worst possible results from mine operation might be.

Thank you for taking our concerns and questions into consideration.

Corinne Schock, President
Lac Le Jeune Conservation Association